Project in Clapham

Insulation works carried out in Clapham, Summer 2020.

We have been working on several South London schools over the past few months – these photos show the external insulation works recently completed on the Clapham school.

The specification: Thermaduct board enclosed in white Proclad sheeting & identified in accordance with DW: 144.

Project in Bishop Auckland

Insulation works carried out at Bishop Auckland Compressor Station, Autumn 2018.

The photo shows the completed works. The specification for this project was 50mm Crimp wrap with a layer of acoustic barrier & then enclosed in stucco aluminium cladding.

 

Project in Nottingham

Installation works carried out in Nottingham in 2018. The ductwork has been insulated with Thermaduct boards and enclosed in 0.7mm “Merlin Grey” Plastisol cladding.

 

Project in Slough

These photos show the installation works carried out at a recent project in Slough throughout 2017.

New Leisure Centre in Worcester

These photos show the installation works carried out at the new Leisure Centre in Worcester.  This project was circa £100k for trace heating & insulation which was completed between October and December 2016.

The Moor at Sheffield

Project carried out for Imtech G&H and the Builder was B&K.  Project value circa value £100k which will service the Indoor Market at Sheffield.

Leeds Arena

This project we carried out for Rotary Building Services and the builder was BAM Construction which was a very fast track project with a contract value of circa £273k.

Chesterfield Hospital Phase 1

This project we carried out for N G Bailey Limited – the pictures show External Chilled Water Pipework which has been insulated using Foil Rockwool section taped and enclosed using 24swg Stucco Aluminium Cladding riveted and identified to BS: 1710 – with mastic at all joints and removable aluminium boxes on all the valves and flanges (The valves and flanges are measured by Gill and manufactured on site at the Gill Head Office in Nottingham). The contract value was circa £100k

Tesco – Berwick Upon Tweed

This project we carried out for LX Engineering – the picture shows External Circular ductwork which has been insulated using Phenolic Flatwrap and White Ventureclad. The contract value was circa £50k

Warner Bros Studios

This project we carried out for Derry Building Services in Newark who are part of Bowmer & Kirkland. This project was very fast track and the majority of the services insulated were at heights of 20 metres. The overall project value was circa £600k and the workmanship carried out by Gill was second to none, look at some of the photos attached.