Project in Nottingham

Installation works carried out in Nottingham in 2018. The ductwork has been insulated with Thermaduct boards and enclosed in 0.7mm “Merlin Grey” Plastisol cladding.

 

Project in Slough

These photos show the installation works carried out at a recent project in Slough throughout 2017.